Our 3D CAD supplier models have been moved to 3Dfindit.com, the new visual search engine for 3D CAD, CAE & BIM models.
You can log in there with your existing account of this site.
The content remains free of charge.
Projects: The project contains ERP connection. These do not correspond to the value specifications. At least one value selection exists (red or orange) which excludes rows with ERP connection.
Values: For this value there are projects with one corresponding ERP connection. The currently set default however excludes this value. At least one selection (of a red/organge project or a red/orange value) must be removed in order to get the value to "green".